Full Interior Renovation with Kitchen & Bath Rebuild

020_dsc03238_654.jpg

Project
Overview

This home on 14th St NE required a complete interior restoration following flood damage. After carefully completing demolition, our team treated the property for mold prevention and ensured thorough drying before reconstruction began. New drywall, insulation, baseboards, and doors were installed throughout the interior, creating a solid foundation for the rebuild. The project also included a full reconstruction of the kitchen and two bathrooms, transforming the space into a safe, functional, and refreshed home.

The Starting Point

Flood damage required a complete interior restoration, including demolition of affected materials, mold prevention treatment, drying, and replacement of damaged drywall, insulation, baseboards, and doors.

What We Did

01 — Demolition & Mold Prevention
Completed post-flood demolition, mold prevention treatment, and drying before reconstruction.

02 — Drywall, Insulation & Doors
Installed new drywall, insulation, baseboards, and 9 interior doors.

03 — Kitchen & Bathroom Rebuild
Completed the full rebuild of the kitchen and two bathrooms.

04 — Paint & Interior Finishes
Painted all interior walls to complete the refreshed interior.

The Finished Space

The completed renovation features a fully rebuilt kitchen and two bathrooms, along with new drywall, insulation, baseboards, doors, and fresh interior paint for a safe and modern living space.